Sphinx Pharma Wetlab

Durham, NC

 

This project was a fast track design build project for Sphinx Pharmaceuticals (Now Eli Lilly and Co.) The project was completed in 10 months construction time. The site work and the shell building were constructed as the interior program was established.

 
  • Design build Project

  • The completed project saw 100% of the contingency fund returned to the tenant.

  • The HVAC system was designed for a Class “A” wet lab facility.

  • The building housed a wet lab with a vivarium used to study microorganisms.

Summary

Scope: 100,000 sf

Owner: Craig Davis Properties, Cary, NC

Architect: WGM Architects
Charlotte, NC

Previous
Previous

Dr. Stein Plastic Surgery

Next
Next

Parexel International HQ