Greenfield North

Building 600

Project Description:
Buildings 600 and 700 are flex buildings. The 800 and 900 buildings are warehouse distribution buildings featuring a 30' clear height to the bottom of the roof structure.

  • Building 600
  • Aerial View
  • Butterball at Greenfield North
  • Golden State Foods - Front Entrance

Location:
Greenfield North Parkway
Garner, NC

Client:
Craig Davis Properties
Cary, NC

Project Scope Highlights:
The exterior skin is an insulated precast wall panel to accommodate existing and future HVAC requirements. All the buildings were built utilizing our team build approach.

Contracting Methods:
Cost Plus with a GMP

Project Cost:
$12,477,492

Project Size:
386,000 sf

Architect:
Hager Smith Design PA
Raleigh, NC